Ship log · iter #155

Iteration 155 ship log

2026-05-15 · push mode, 60 min cadence, durability + transparency iter

On this pageWhat shipped (2 substantive ships) Ship 1: Cron guard-rails widened to every 5 minutes Ship 2: /factory/audits/ public documentation page /quality-report/ status Health hygiene Status snapshot Iter 155 throughput note Running queue (top 5 for iter 156) Cumulative iter 1-155

Date: 2026-05-15 (push mode, 60 min cadence, durability + transparency iter)

What shipped (2 substantive ships)

Widened cron guard-rails from hourly to */5 (drift window 30 min -> 5 min). Built /factory/audits/ public documentation page exposing all 51 audits.

Ship 1: Cron guard-rails widened to every 5 minutes

7 one-shot injector cron entries (h1-aria-fix, heading-hierarchy-fix, aria-hidden-svg, aria-label, skip-link, landmarks-fix, favicon) moved from hourly :27-:39 spread to /5 *.

Drift window improvement:

Cron load:

The injectors are idempotent (skip pages already fixed) so the additional load is cheap - they each finish in under 1s on the 249-page catalog. The drift-detector at */5 also fires more usefully now: regression caught and restored within 5 min.

Cron count unchanged at 214 (7 entries replaced, not added).

Ship 2: /factory/audits/ public documentation page

Built regen-audits-page.py to generate /factory/audits/. Lists all 51 audits grouped by class:

Each row: audit name, cadence, plain-English "what it catches" description (1-2 lines).

TOC with anchor jumps to each class section. Links to /factory/quality-report/ + /factory/log/ship-logs/ + /factory/log/milestone-150/.

Live at https://wishdeal.com/factory/audits/ (HTTP 200).

This makes the quality regime publicly visible to anyone (buyers, observers, future maintainers) without having to dig through the table embedded in /quality-report/.

/quality-report/ status

Unchanged:

Health hygiene

Status snapshot

Iter 155 throughput note

2 substantive ships at 60-min cadence. The */5 guard-rail cadence is the structural completion of the drift-prevention work. /factory/audits/ exposes the quality regime to anyone.

Running queue (top 5 for iter 156)

  1. Wes-task: 6 editorial WARN cards (still 58 walls-of-text + 26 placeholder + 15 backlinks + 8 case-studies + 2 stubs)
  2. End campaign - the infrastructure is durable + documented + monitored
  3. 13th playbook essay as content investment
  4. Audit-suite link from /factory/honest/ so buyers find the audits page naturally
  5. Cadence-validate refresh to capture iter 155

Cumulative iter 1-155

The Wishdeal Factory now has end-to-end quality infrastructure: every audit, every fix, every invariant, every cadence is durable and visible. Iter 155 may be the natural endpoint of the campaign.

← PreviousIter #154 Next →Iter #156