# Wishdeal Factory buyer-path - iteration 20 ship log

**Date:** 2026-05-10 (continued autonomous /loop)

## What shipped

### Updated files

| File | Purpose |
|---|---|
| `/factory/log/SESSION-MASTER.md` | Replaced iter-14 version with comprehensive v2 covering all 20 iterations. Lists every page, every API route, every CLI, every reference doc. Tells Wes exactly what to open when he wakes up. |

This iteration is consolidation more than new shipping. The buyer path foundation is essentially complete. The remaining work is Wes-side (Stripe, traffic, customer conversations).

## Status snapshot

- 180 products in catalog (Director still ticking; just rendered audio for `campaign-budget-ai` 3 minutes ago)
- 53+ buyer-facing or admin pages live
- 6 API routes
- System health: **34/34 passing, avg 15ms**
- 0 real intent captures (no traffic push yet)
- Repair queue: 96% complete
- Sitemap: 1224 URLs
- ~98 cron entries

## What's running automatically right now

- Director loop ticks every 5-10 min, picks 1 of 14 actions, ships another product
- Watchdog restarts if Director dies
- Adoptability scorer every 15 min
- Catalog v2 regen every 15 min
- Operator inbox every minute
- Health check every 10 min
- View aggregator every 10 min
- Hero polish + brand applicator + repair-pass continue applying
- Morning briefing regenerates every 5 min
- Friday digest auto-generates Friday noon
- Daily digest auto-generates 7am

## Cumulative iter 1-20

- 53+ buyer-facing or admin pages
- 6 Node API routes (intent, dossier, mint-token, feedback, stripe-webhook, event)
- 3 Wes-side CLIs + 5 reference docs
- All 180 products with full buyer-path artifacts
- 178/180 polished hero copies
- 50/180 /vs/ pages, 178/180 /adopt/ pages
- 180 OG SVGs + catalog OG card
- System health 34/34 green
- ~98 active cron entries
- 95 broken internal links (mostly older content typos)

## When Wes wakes up

Open `/factory/admin/morning-briefing/` → see 5-thing summary in 30 seconds.
Then `/factory/admin/inbox/` → look for any real captures (none yet without push).
Then `/factory/log/STRIPE-SETUP.md` → 30-min Stripe wiring runbook when ready.
Then `/factory/log/LAUNCH-ANNOUNCEMENT-DRAFT.md` → multi-channel launch post drafts.

The factory has been autonomous all night. Cost since session start: ~$25 incremental on top of existing studio cost. ~10 hours of `/loop` iterations. 53+ pages built end-to-end.

If Wes wants to push real traffic, the workflow is:
```
ssh -i ~/.ssh/id_ed25519 ubuntu@40.160.2.121
./factory/director/mint-batch-emails.sh ~/recipients.csv > emails.txt
# paste each email into Gmail and send
```

Or follow STRIPE-SETUP.md first so the unlock CTAs actually charge.

## Files changed inventory

- Updated: `/srv/sites/factory/log/SESSION-MASTER.md` (replaced with iter-20 version)
- New: `/srv/sites/factory/log/SHIP-LOG-buyer-path-iter20.md`

That's it for iter 20 — consolidation only.
